EPCC
DREDGING WORKS IN NAVIGATION AREA AND EXCAVATION WORKS OF THE UNSUITABLE MATERIAL IN THE RECLAMATION AREA FOR PENGERANG MARITIME INDUSTRIAL PARK (P-MIP)
Execution of dredging works in the navigation area to facilitate hopper barge access, along with the removal of unsuitable materials at the reclamation area in Pengerang Maritime Industrial Park.”

EPCC
PROVISION OF SEDIMENT REMOVAL USING DREDGER AND WATER JETTING FOR PIPELINE IN TRENCH AT SUNGAI JOHOR
Execution of live pipeline post trenching and sediment removal works from KP44+257 to KP45+971 (Sungai Johor & Pulau Juling), ensuring a burial depth of 2 meters Top of Pipe (TOP).

EPCC
PROVISION OF SHORELINE PROTECTION AT SUNGAI JOHOR FOR PETRONAS GAS BERHAD 36-INCH GAS PIPELINE
Shoreline protection design for Post Trenching Works at Sungai Johor for Pengerang Gas Pipeline Project (POTCH). The shoreline protection work located at Penyabong side.
EPCC
DESIGN, SUPPLY, DELIVERY TO SITE, INSTALL, TESTING, COMMISSIONING, AND GUARANTEE OF NEW BIOGAS BURNER SYSTEM AND ANCILLARY WORKS FOR PAMOL KLUANG PALM OIL MILL, KLUANG, JOHOR
The project involves constructing civil and structural components, installing pipelines, executing E&I works, and commissioning the burner system to transport biomethane gas from the bio-digester.

EPCC
DESIGN, SUPPLY, DELIVERY TO SITE, INSTALL, TESTING, COMMISSIONING, AND GUARANTEE OF NEW BIOGAS BURNER SYSTEM AND ANCILLARY WORKS FOR LEEPANG PALM OIL MILL, LAHAD DATU, SABAH
IOI Plantations Services Sdn. Bhd. has awarded Mechanovation Hitec Sdn. Bhd. and Forbes Solution Sdn. Bhd. the contract to develop a biogas burner system at Leepang Palm Oil Mill, Lahad Datu, Sabah. The project includes civil and structural works, pipeline installation, E&I installation, and commiss

EPCC
PROVISION OF MAINTENANCE WORK ON DNEX CABLE LAY MACHINERY FOR HYDRAULIC SYSTEM FOR LINEAR CABLE ENGINE (LCE) & DRUM CABLE ENGINE (DCE)
Conducted surveys, troubleshooting, and performance studies on mechanical and electrical infrastructure installations, followed by the preparation of a comprehensive calibration report and a fit-for-use certificate.

EPCC
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR SSGP KP265 PIPELINE RE-REROUTE WORKS (SLOPE WORKS)
In January 2020, a landslide at KP265 caused a pipeline rupture, leading to the immediate suspension of SSGP operations. The restoration efforts include extensive civil and geotechnical work, along with the re-routing of approximately 340 meters of pipeline. This critical repair is targeted for comp