KL Petrogas Sdn Bhd / Petronas Gas Berhad
Execution of live pipeline post trenching and sediment removal works from KP44+257 to KP45+971 (Sungai Johor & Pulau Juling), ensuring a burial depth of 2 meters Top of Pipe (TOP).
The Sungai Johor and Selat Mendana crossings are a 1.8km and 500m river crossing and are part of the 72km Pengerang Gas Pipeline Project (PGPP) .The pipeline has been commissioned mid-June 2017 and is currently supplying gas to Pengerang COGEN Plant and the PGU system and was left as laid, unburied on the riverbed ever since.
CONTRACTOR general scope of work comprise as follows;