In January 2020, at KP265 the pipeline was parted due to landslide occurred and caused the operation of SSGP being stopped immediately. Among other repair works of SSGP, at KP265 is the major repair works needs to be performed before the pipeline can be back into operation that is targeted in July 2022. At KP265, the major activities are civil and geotechnical works and re-routing of the parted pipeline for a length of approximately 340 meters.